The Advanced Cost Engineering Workshop from 3rd to 5th April 2013

Top Link's picture
Printer-friendly versionPrinter-friendly versionPDF versionPDF version

Top Link Asia as the host of the Advanced Cost Engineering Workshop which will be held at International 5 Star Hotel Kuala Lumpur Malaysia from 3rd to 5th April 2013.The trainer of this workshop will be Dr. Paul D. Giammalvo



Johor Bahru, Johor, Malaysia., March 5, 2013 - (PressReleasePoint) -As many owner project organizations have suffered from a lack of resources and staffing for almost an entire generation of capital projects. The lack of attention to the cost engineering discipline has come at the expense of poor capital performance and the owner’s relative inability to perform critical cost engineering functions such as the development of early cost estimates to assist in proper alternative selection and the relative inability to review and validate a project’s estimate due to a lack of in-house data and expertise. 

Come and  better understanding  of cutting edge cost estimating concepts, practices and methodology, reviewing how combining the scope statement and the WBS assist in identifying and assessing the impact of changes on projects, creating innovative and incentive project contracting and in-depth analysis of cost plus incentive contracting at the Advanced Cost Engineering  workshop hosted by Top Link Asia. It is a 3 days’ workshop from 3rd to 5th April at the International 5 Star Hotel Kula Lumpur, Malaysia.



This workshop will be facilitated by Dr.Paul D. Giammalvo  who is a project consultant to many multinational companies especially in engineering, oil and gas, automotive, construction and telecommunication industry. His high profile clients include Petronas, Caltex, PT Pertamina, Unocal, BP,Telekom Malaysia,Vico, General Motor, Siemens, Nokia and Wilson Engineering.


The focus of this workshop will be on providing the knowledge, techniques, and practical application of project costing and estimation tools to the maximization of business returns. Also, participants will be able to learn the effective and innovative contracting strategy applicable to SE market.

Project consultants, cost engineer, product development engineers, operation engineer and technical engineers from oil & gas, petrochemical, automotive, EPCC, Telecommunication and IT are encouraged to attend this workshop.
Delegates will also be able to :

  • Explore the various types of simulations adopted by leading organization in different industry to enhance the cost accuracy.
  • Understanding the process of identification of cost drivers and application of Activity Based Costing to Determine the real cost.
  • Learning the tools, techniques and accuracy for different cost estimates Identifying and knowing which tools and techniques are best practices in earned value management.
  • Familiarizing to implement a “real time” Earned Value Management system based around Excel in order to obtain accurate and timely information from the field.


Do visit our website http://www.toplink-asia.com/index.php or Facebook page https://www.facebook.com/pages/Top-Link-Conference-Event-Management/136553853060715?ref=hl for more of the event details

For more information, contact via email or call +607 225 4823
Contact person:
Mei Ping
Tel: +607 225 4823
Email: meiping.kee@toplink-asia.com


 
 


Press Contact:
Kee Mei Ping
Top Link Conference & Event Management
Suite 13-06, Level 13,
Johor Bahru City Square (Office towe
607 -225 4823
http://www.toplink-asia.com/
*******.***@**p**n**a**a.com
Email partially hidden to block spam. Please use the contact form here.
Contact Kee Mei Ping
Email the contact person for this press release. Do not send spam or irrelevant message.
CAPTCHA
This question is for testing whether you are a human visitor and to prevent automated spam submissions.
2 + 2 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.


Copy this html code to your website/blog and link to this press release.