The Best Practices of Combined Cycle Power Plant Operations Workshop
A combined cycle power plant is very large, typically rated in the hundred of mega watts. If any combined cycle power plant operates only the gas turbine to generate electricity and diverts the exhaust, there is a substantial loss of efficiency. To achieve combined cycle power plant operations, the owner and the engineer must address cycling flexibility, availability, and reliability.
Johor Bahru,Johor, Malaysia., February 17, 2013 - (PressReleasePoint) -From the 25th till 27th of march 2013, Top Link Conference will be hosting a 3 days workshop with the theme of The Best Practices of Combined Cycle power plant
By participating in this workshop, participants would be able to:
- Re-examining the inheret benefits of CCPP generation
- Explain the thermodynamic process in CCPP
- Describe the main components of and industrial gas turbine
- Explain the process of steam generation
- Explain the importnace of water chemistry in steam generation
- Describe the componetes and function of a Heat Recovery Steam Generator (HRSG)
- Understand the mainteneace requiremenst of a Combined Cycle Power Plant
- Describe the factors involved in developing and implementing a maintance program for a combined cycle power plant
- Discuss factors affecting combined power plant performance.

Clive Warrender
Cliver Warrender has over 30 years Power Station operational experience with steam turbines up to 350 MW, OCGTs up to 17 MW and all auxiliary Power Station plant. As Shift Charge Engineer he was responsible for plant operator training which included HV switching, Synchronizing, GT operations, Fire systems, and emergency procedures.Clive’s most recent full time power plant experience was supervising site and contract staff on CCGT and OCGT routine maintenance and major refurbishment. He has worked for RWE Npower, National Power and CEGB
Register before 28 February 2013 for Special Discount rate NOW!!!
For more information, do contact
Kee Mei Ping
Tel: +607 225 4823
E-mail: meiping.kee@toplink-asia.com
Press Contact:
Kee Mei Ping
Suite 13-06, Level 13,
Johor Bahru City Square (Office tower)
106-108, Jalan Wong Ah Fook
80000 J
607 -225 4823
http://www.toplink-asia.com/
*******.***@**p**n**a**a.com
Email partially hidden to block spam. Please use the contact form here.
More User Press Releases
- Best Practices of Demand Planning and Forecasting for Sales & Operations Planning 4-5 June 2013 | Kuala Lumpur
- Don’t Miss It, ‘Integrated Business Planning for Oil and Gas’ on 20 till 24 May 2013.
- Best Practices of Demand Planning and Forecasting for Sales and Operations Planning
- Explore more in “Best Practices of PHA, HAZOP & HAZOP Leadership on 20-24 May 2013”.
- Top Link Asia Pleased to invite you to “Best Practices of Rotating Equipment: Compressor, Pump and Turbine” on 13-17 May 2013.
- The Best Practices of Rotating Equipment
- The Advanced Cost Engineering Workshop from 3rd to 5th April 2013
- Advanced Social Media Marketing 2013
- Piping Dynamic Analysis & Vibration hosted by TopLink Asia
- World Class Shutdown, Turnaround, Outage & Reliability Asset Management

This press release is licensed under a Creative Commons Attribution 3.0 Unported License. Read full copyright information here.
Like this site on Facebook
Distribute Press Release
User login
Search
Bookmark/Search this post
Page View Counter
Primary Menu
- News by Region
- Business
- List of Industries
- Technology
- Aerospace & Defense
- Agriculture & Forestry
- Arts
- Automotive
- Business Services
- Chemicals
- Construction & Maintenance
- Consumer Goods
- Education
- Electrical & Electronics
- Energy
- Entertainment
- Food & Related Products
- General Business
- Government
- Healthcare
- Heavy Industry
- Home
- Industrial Goods & Services
- Industrial Materials
- Medical
- Mining & Drilling
- Publishing & Printing
- Retail
- Society
- Sports
- Supermarkets
- Telecommunications
- Textiles & Nonwovens
- Transportation & Logistics
- Travel & Hospitality
- Wholesale
