The Best Practices of Combined Cycle Power Plant Operations Workshop

Top Link's picture
Printer-friendly versionPrinter-friendly versionPDF versionPDF version

A combined cycle power plant is very large, typically rated in the hundred of mega watts. If any combined cycle power plant operates only the gas turbine to generate electricity and diverts the exhaust, there is a substantial loss of efficiency. To achieve combined cycle power plant operations, the owner and the engineer must address cycling flexibility, availability, and reliability.


Johor Bahru,Johor, Malaysia., February 17, 2013 - (PressReleasePoint) -From the 25th till 27th of march 2013, Top Link Conference will be hosting a 3 days workshop with the theme of The Best Practices of Combined Cycle power plant


By participating in this workshop, participants would be able to:

  • Re-examining  the inheret benefits of CCPP generation
  • Explain the thermodynamic process in CCPP
  • Describe the main components of and industrial gas turbine
  • Explain the process of steam generation
  • Explain the importnace of water chemistry in steam generation
  • Describe the componetes and function of a Heat Recovery Steam Generator (HRSG)
  • Understand the mainteneace requiremenst of a Combined Cycle Power Plant
  • Describe the factors involved in developing and implementing a maintance program for a combined cycle power plant
  • Discuss factors affecting combined power plant performance.



Clive Warrender

Cliver Warrender has over 30 years Power Station operational experience with steam turbines up to 350 MW, OCGTs up to 17 MW and all auxiliary Power Station plant. As Shift Charge Engineer he was responsible for plant operator training which included HV switching, Synchronizing, GT operations, Fire systems, and emergency procedures.Clive’s most recent full time power plant experience was supervising site and contract staff on CCGT and OCGT routine maintenance and major refurbishment. He has worked for RWE Npower, National Power and CEGB




Register before 28 February 2013 for Special Discount rate NOW!!!


For more information, do contact
Kee Mei Ping
Tel: +607 225 4823
E-mail: meiping.kee@toplink-asia.com


Press Contact:
Kee Mei Ping
Suite 13-06, Level 13,
Johor Bahru City Square (Office tower)
106-108, Jalan Wong Ah Fook
80000 J
607 -225 4823
http://www.toplink-asia.com/
*******.***@**p**n**a**a.com
Email partially hidden to block spam. Please use the contact form here.
Contact Kee Mei Ping
Email the contact person for this press release. Do not send spam or irrelevant message.
CAPTCHA
This question is for testing whether you are a human visitor and to prevent automated spam submissions.
1 + 2 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.


Copy this html code to your website/blog and link to this press release.